MIME-Version: 1.0 Content-Location: file:///C:/1D2C3A38/Maintenance3-17-08.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii" Maintenance report March 17, 2008 this year so far

Maintenance r= eport April 3, 2008, 2008 this year so far

 

Office and ma= il house

        &= nbsp;   Pressure wash buildings

   &nbs= p;        Flowers and bushes

   &nbs= p;        Sprinkling system repair

   &nbs= p;        Spray reflection pond vegetation

   &nbs= p;        Add blue coloring to same

 

Lake Bluebonn= et

Removed dead  trash fish” fr= om Lake Bluebonnet 

5 tractor bucket loads  1000#s of almost entirely t= rash fish

Mostly Gar Carp and Shad

Overflow spill way concrete= repair    

 

Tennis courts=

Tennis lights refurbished 3= of 4 lights at club house, primer and paint rewired total and new lights  

Estimated by Charlie Rogers= as a $3,000 job

Breaker box at tennis court=

Estimated cost  $1200 box itself $300

Install new light timers

 

Club House Ar= ea

   &nbs= p;        Installed brown posts in parking area

   &nbs= p;        Plant and landscap bushes, flowers etc.

   &nbs= p;        New area lighting

   &nbs= p;        Shaded seating at pool

   &nbs= p;        Mulched play area

   &nbs= p;        New restroom fixtures

   &nbs= p;        Repair and paint BBQs

   &nbs= p;       

Eagle Lake House and Pavilion

   &nbs= p;        Mulched play area

   &nbs= p;        Pressure washed buildings

   &nbs= p;        Planted flowers

   &nbs= p;        Restriped parking lot

New gate operators (2)

Pressure wash white fence

Clean roof

Clean paint guard rails wat= er wells

Repair and paint BBQs

New lights and photo cells =

 

 

 

Swimming pool= s

   &nbs= p;        New sand filters Estimated=   contractor cost $3-4000

   &nbs= p;                &= nbsp;   2@ 521

   &nbs= p;                &= nbsp;   1@ Club House

   &nbs= p;            &= nbsp;       Install new ropes

   &nbs= p;            &= nbsp;       Clean life preservers

   &nbs= p;       

521 pool area=

Rebuilt 521 dumpster enclos= ure and new slab

Repaired parking lot concre= te

   &nbs= p;        Installed new Sand filters

All new sink and shower fix= tures.

New gate operators (2) .

 

Camp Ground

   &nbs= p;        General clean up

   &nbs= p;        Pressure wash and paint bridge

   &nbs= p;        Clean up showers

   &nbs= p;        Pressure wash tables / slabs

   &nbs= p;        Pressure wash and paint bridge

 

Storage Lot

   &nbs= p;        Final clean up

Removed junk

Burned rubbish

   &nbs= p;       

Trees

Trimmed nearly every tree o= n the ranch 150-200 trees

         &= nbsp;  Probably worth $100 + each

 

Plumbing work=

Treated and maintained all<= /p>

5 septic tanks

   &nbs= p;        13 toilets

   &nbs= p;        5 Urinals

 

Other general= projects

 

Rain shelter cover over breakers at Lake Bluebonnet

 

New water treatment system at Club House Green sand filter.

 

New (6) manhole covers and rings

   &nbs= p;       

Fire extinguishers inspected

 

Kill vegetation in ditches around club house.

 

   &nbs= p;        Fire ant control

 

Pressure wash all property facilities. 

 

   &nbs= p;        Man hole covers and rings on Flint Lock.

 

White Rock placed on Pony Trial extension

 

Reworked ditch near Pony Trail near Frontier,

 

Cleaned flood gates Pony Trail